Site investigation
Approved document C, Site preparation and resistance to contaminants and moisture, suggests that the extent and level of site investigations needs to be tailored to the type of development and the previous use of land.
The approved document suggests that site investigations should consist of four well-defined stages:
- Planning stage: Setting clear objectives for the site investigation, including scope and requirements, which enable it to be planned and carried out efficiently and provide the required information.
- Desk study: Reviewing historical, geological and environmental information about the site.
- Site reconnaissance (a walkover survey): Identifying actual and potential hazards and the design of the main investigation.
- Main investigation and reporting: Including intrusive and non-intrusive sampling and testing to provide soil parameters for design and construction.
Site investigations should include:
- Susceptibility to groundwater levels and flow.
- Underlying geology, and ground and hydro-geological properties.
- Identification of physical hazards.
- Identification of methane and other gases.
- Determining an appropriate design.
- Providing soil parameters for design and construction.
Where a site may be affected by contaminants, a combined geotechnical and geo-environmental investigation should be considered and remediation maybe necessary.
It may also be necessary to notify findings to regulatory authorities, for example:
- Where contaminants are found that had not been previously known about.
- In planning applications.
- In relation to waste management and the protection of water quality and resources.
[edit] Related articles on Designing Buildings
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















